Skip to content

MVP budget briefing

What will your MVP cost? Configure it — and see real numbers.

Compose your feature scope and get a full budget briefing: three procurement paths compared, the core-MVP recommendation, risk flags and year-one total cost. No sales funnel — including the honest answer “you don't need us for this”.

In Germany in 2026 an MVP costs roughly €8,000–60,000 at traditional agencies (hourly) and from €12,500 as a fixed price at AI-native studios, depending on scope. This calculator doesn't estimate price — it estimates complexity (in complexity points) and converts it transparently into three procurement paths.

Feature scope

4 features preselected for “Web app MVP” — adjustable anytime.

App foundation (shell, routing, design system)10 CPSign-up & login (email/password)5 CPCore data model (1–3 entities, CRUD)8 CPGDPR basics (mandatory)3 CP

Three paths

Your budget — across three procurement paths

Same scope, three ways to build it. We don't win every configuration — and we say so.

Traditional agency

Hourly · full guidance

€10,816 – €18,928
from €12,844 median
Year-1 total cost
€12,798 – €23,074
Code ownership
Code-Ownership üblich, aber vertraglich prüfen. Wechselkosten bei Agenturwechsel: Einarbeitung neuer Entwickler 10–20 % Aufschlag.

Fits when: you want an established agency with full guidance and the budget is there.

Doesn't fit when: budget is tight or speed matters most — hourly rates scale with every hour.

6 weeks

AI-native studio

Fixed price · AI-accelerated

€12,500
Scope is below the fixed-price floor — includes a buffer for iterations.
Year-1 total cost
€14,110 – €14,735
Code ownership
Voller Code-Ownership, EU-Hosting, dokumentierte Architektur — Weiterentwicklung durch jedes Team möglich.

Fits when: you want a quickly testable, cleanly built version with full code ownership.

Doesn't fit when: you're migrating a 300-hour legacy system or need deep specialist-domain expertise over months.

Delivery: Code Prototype (€12,500) as the base, then prototype loops (€4,500 each) to the MVP.

3 weeks

Build it yourself

Lovable / Claude Code

€413
Direct costs (tools)
Founder hours
156 h
Timeline
11 weeks · 3 months
Statistical rework risk: €2,500 (25%)

Expected cost if the DIY build needs professional rework before launch (probability × 0.8 × AI fixed price).

Fits when: you're technically capable, want to invest time over money and the scope is small.

Doesn't fit when: it involves real money, sensitive data or scaling — then DIY costs more than it looks.

First: a code-free validation sprint

You indicated the idea isn't validated yet. Before building code: a validation sprint (from €1,350) first checks whether anyone wants the product — the cheapest mistake-avoider in this calculator.

Core MVP

This is enough to test your core hypothesis

By the MoSCoW method: only the features that truly validate your hypothesis. The rest is phase 2.

19%
less budget than the full scope
€12,500
AI-nativ · 21 CP

Core features

  • App foundation (shell, routing, design system)
  • Core data model (1–3 entities, CRUD)
  • GDPR basics (mandatory)

Honest flags

What to watch for at this scope

  • InfoDu hast angegeben, dass die Idee noch nicht validiert ist. Bevor du €12,500 investierst: Ein Validierungs-Sprint ohne Code (ab 1.350 €) prüft erst, ob jemand das Produkt will. Das ist der günstigste Fehler-Vermeider in diesem Rechner. Learn more →

Share & take away

Embed on your site

Copy the code to embed the calculator:

<iframe src="https://www.decivo.de/embed/en/mvp-cost-calculator?c=1-1-IgIAAAI-0-1-f-x-0" width="100%" height="640" style="border:1px solid #e5e5e5;border-radius:12px" title="MVP-Budget-Briefing — decivo" loading="lazy"></iframe>

MVP-Kosten-Index 2026.06

How is this calculated? → Methodology & data index

FAQ

What does an MVP cost? — frequently asked

Turn numbers into a project?

Bring your briefing to a first call. We'll assess your scope honestly — even if the leanest path doesn't run through us.

115-min call2Clear assessment3Start in days

Clearly structured. No sales pressure. Ready to start in days.